| Availability: | |
|---|---|
| Quantity: | |
LW-BL
Lingwen
BL026
1、Process flow chart
1) Automatic feeding and cutting tube to fixed length
2) Automatic feed clamp
3) Apply Cylco to tube and connect pump connector
4) CCD test the pump connector in right place
5) Apply Cyloco to tube and connector connector
6) Automatic feeding cap
7) Unload OK / NG products

2、Functions
1) Gluing , solidification
2) Assembly Pump 、Pinch Clamp、Protective Cap、 Sampling Port、
Arterial Drip Chamber、Venous Drip Chamber、Pump Connector
3) CCD、camera testing and checking
3、lead time
4 months
4、Packaging
Wooden case shipped by sea
5、warranty time
1 year
6、After-sales service
support 7*24H,training support,Installation, wear parts...